Reyes Construction
Job Scope: The Work consists, in general, of constructing a new pedestrian underpass at the existing Poinsettia Station, located in NCTD Right-of-Way in the City of Carlsbad, and closing the two existing at-grade pedestrian crossings. The existing railroad tracks will be re-aligned farther to the west. The eastern station platform will be widened and the existing western platform will be removed and replaced. Both platforms will be lengthened to a total length of one thousand feet. Approximately 2,400 feet of each railroad track will be removed and replaced through the limits of the platforms.