Local Bidding Opportunities

Route 805 Sweetwater

Route 805 Sweetwater
Department of Transportation (CALTRANS)
Flatiron West, Inc.
We are requesting bids for the following trades and/or material suppliers:
DBE Goal 14%. Request for quotes from Certified DBE's Subcontractors and Suppliers for the following, but not limited to scopes of work: AC Dike, Aggregate Supply, Bridge Removal, CIDH, Clearing & Grubbing, Concrete Barrier, Concrete Supply, Construction Area Signs, Drive Pile, Electrical, Erosion Control, Fences, Guardrail, Joint Seal, Landscape & Irrigation, Minor Concrete, Miscellaneous Iron & Steel, Overhead Signs, Pipe Supply, Railing, Reinforcing Steel, Roadside Signs, Rock Slope Protection, Street Sweeping, Striping.
Bid documents can be viewed at or obtained from:

Plans and specifications are available, at no cost from Caltrans website: http://www.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=11-430184. Additionally, plans and specifications are available at Flatiron’s San Marcos, CA and Chino Hills, CA offices. Please call to make an appointment to view plans and specifications.

Flatiron analyzes and considers each DBE quote, including those that are broken down into economically feasible units to facilitate bidding. Assistance in obtaining bonding, lines of credit, insurance, equipment, supplies and materials is available upon request. Additionally, please contact us if you require technical assistance. Quotations must be valid for same duration as specified by Owner for contract award. Subcontractors are required to possess and maintain a current contractor’s license and must also be registered with the Department of Industrial Relations (DIR) as required by Public Contract Code Section 1725.5. Subcontractors will be required to execute Flatiron’s Standard Subcontract Terms and Conditions and insurance requirements. A copy of our Standard Subcontract Terms and Conditions is available in electronic format upon request. Bond Requirements: Notwithstanding any contrary language in a bid to Flatiron or any prior course of dealing between Flatiron and a bidder, and unless waived in writing by Flatiron, Flatiron reserves the right to require each bidder to provide payment and performance bonds assuring bidder’s obligations to Flatiron in the amount of 100 percent of the bid to Flatiron. Flatiron will reimburse the bond premium at actual cost not to exceed 3%. The surety on the bonds must be a California admitted surety. Non-DBE Subs/Suppliers: Indicate 2nd tier DBE participation offered on your quotation as it will be evaluated with your price. WE ARE AN EQUAL OPPORTUNITY EMPLOYER.

Flatiron West, Inc.
1770 La Costa Meadows Drive
San Marcos, CA 92078
Phone: (760) 916-9100 Fax: (760) 471-4860
Email: SoCalBids@flatironcorp.com
Jannette Carter

11/28/18

2:00PM
Jannette Carter
1770 La Costa Meadows Drive, San Marcos, CA 92078
(760) 916-9100
(760) 471-4860
SoCalBids@flatironcorp.com