Local Bidding Opportunities

CT 11-420104/ RT 5 – Construct Auxiliary Lane, Sign and Landscape

State of California (Caltrans)
Hazard Construction Company
Hazard Construction is seeking qualified and certified DBE subcontractors, and material and/or equipment suppliers in the areas of work included in, but not limited to, those listed below.

A complete set of plans, specifications and any addendums that may be issued for this project are available for your review at no charge in our plan room or download at the agency’s website:

http://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php

*** THIS IS A PREVAILING WAGE PROJECT ***

SUBTRADES: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, PREPARE SWPPP, TEMPORARY EROSION CONTROL, CLEARING AND GRUBBING, HAUL/DISPOSE AERIALLY DEPOSITED LEAD, LANDSCAPE & IRRIGATION, HOT MIX ASPHALT SUPPLY, PLACE HMA (MISC AREA), JOINTED PLAIN CONCRETE PAVEMENT, JOINT SEAL, GRIND EXISTING CONCRETE PAVEMENT, CAST-IN-DRILLED-HOLE CONCRETE PILING, OH SIGN FOUNDATION, FURNISH/INSTALL SIGN STRUCTURE, ALTERNATIVE PIPE CULVERT SUPPLY, GRATED LINE DRAIN SUPPLY, MISCELLANEOUS IRON AND STEEL, DITCH LINING, FENCING, STRIPING AND PAVEMENT MARKINGS, ROADSIDE SIGNS, MIDWEST GUARDRAIL SYSTEM & RELATED, CONCRETE BARRIER, REINFORCING STEEL, SUBSURFACE LOCATOR, FIBER OPTIC SYSTEM, MODIFY EXISTING ELECTRICAL SYSTEM, READY-MIX CONCRETE SUPPLY, AGGREGATE SUPPLY, TRUCKING.
IMPORTANT! We are an Equal Opportunity Employer. We seek and encourage bids from certified SLBE, ELBE, DBE, UDBE, DVBE, SBE, MBE, WBE and OBE businesses. If your scope of work requires materials, please consider and list suppliers on your quote. For all public projects Payment and Performance Bonds are required for 100% of the subcontract amount. Hazard will compensate for up to 3% for the required Bonds.

Please contact Hazard Construction Company should you need assistance in obtaining bonding, lines of credit or required insurance, equipment, supplies and or materials. Please visit our website to view Hazard Construction Company’s Insurance Requirements for General Liability, Auto and Workers’ Compensation for Subcontractors at http://www.hazardconstruction.com/HCCInsReq.pdf.

Please note that the requirements of SB 854 became effective on March 1, 2015. From this point forward All contractors and subcontractors who bid or work on a public works project must register and pay an annual fee to DIR. No Subcontractor may be listed on a public works projects without this registration # and expiration date. The following link leads you to a search website where you can enter the contractor’s legal name or license number https://efiling.dir.ca.gov/PWCR/Search.action

03/27/19

2:00PM
Bryan Seeger
6465 Marindustry Drive San Diego, CA 92121
858-587-3600
858-453-6034
bseeger@hazardcon.com