Local Bidding Opportunities

AC Water Group 1030 Bid No. K-19-1834-DBB-3

City of San Diego
Ortiz Corporation
SCOPE OF WORK: AC Water Group 1030 is located in Council District 2, within the Peninsula Community Area. The scope of the project is to replace 9,451 Linear Feet of existing 6, 8, 10,and 12-inch CMLS and prioritized AC water main, water appurtenances, fire hydrants, pavement resurfacing, curb ramps, and install 2002 Linear Feet of 12-inch new parallel watermain adjacent to the existing to provide the required loop system on the Shelter Island Drive. Also included water appurtenances, fire hydrants, trench shoring, pavement resurfacing, rench repair, curb ramps, all other work associate with this project.

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: 237110: Dewatering Hazardous water, 237310: Slurry Seal, Concrete Pavement, 238990: Hazardous Waste Management Plans, 541820: Community Liaison & 562910: Contaminate Soils Disposal of RCRA and non-RCRA Material.

Please let Ortiz Corporation know if you plan to bid on this project by emailing the Estimating Department@ Estimating@ortizcorporation.com or faxing back the invitation to bid.

Ortiz Corporation is actively seeking and will seriously consider all Quotes from interested and Qualified Consultant, Subcontractor, Supplier and Vendor Certified SLBE-ELBE's submitted by date stated above to be responsive. Ortiz will negotiate & is very willing to breakdown any portion of contract bid item to encourage & facilitate participation as well as assist in obtaining necessary equipment, supplies, materials or related assistance or services. Material suppliers submitting bids in excess of 50-miles of City limits shall be responsible for cost associated with travel, meals, lodging & car rental for two inspectors. Bonds/Insurance are required, Ortiz will only reimburse cost of actual bond (NO EXEPTIONS). ASSISTANCE is available for lines of Bonding/Credit Lines/Certifications including City of San Diego SLBE-ELBE Program registration process. Willing Subs will be signing an AGC Sub-Contract form & adhere to Ortiz terms & conditions with documentation delivery schedule available upon request. Ortiz Corporation is an Equal Opportunity Employer and all participating Subs must follow same guidelines. If you have any questions, please let us know immediately. STATE PREVAILING WAGE RATES APPLY - MANDATORY USE OF APPRENTICES

SLBE participation: 9.2% ELBE participation: 13.1%
Total mandatory participation: 22.3%
The estimated cost of the project is $ 6,660,000.00
Plans & Specs can be downloaded for free at: https://www.planetbids.com/portal/portal.cfm?companyID=17950

04/30/2019

2:00 PM
Estimating Dept.
2000 McKinley Avenue, National City, CA 91950
619-434-7925
619-434-7931
Estimating@ortizcorporation.com